Request a quote

MARKET / Europe & periphery

Turkey

Turkey is predominantly left-hand drive, with CE conformity and emission rules confirmed up front. About 4–6 weeks via Istanbul / Mersin.

HANDLE
left-hand drive
PORT
Istanbul / Mersin
DUTY
0–10%
LEAD TIME
4–6 weeks
01 / OVERVIEW

Market overview

Demand concentrates in Mini excavator and Mini dump truck; specifications are fixed against this market's ports and mains.

For Turkey we confirm transport to Istanbul / Mersin and the local rules at the specification stage, before quoting a model and an estimate.

02 / DEMAND

Models in demand

03 / CUSTOMS

Import and customs

Duty is indicative 0–10%. For the EU, CE (CE) and a Machinery Directive declaration are required.

Duty and certification figures are indicative. We confirm the latest tariff and local requirements before shipment.

04 / CONDITIONS

Local conditions

Mediterranean, dry. Mains 230 V / 50 Hz; left-hand drive. For cold regions we specify low-temperature starting.

Request a quote for this market

Request a quote Back to export markets